From:                              route@monster.com

Sent:                               Saturday, April 16, 2016 2:04 PM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: NSN Construction Manager

 

This resume has been forwarded to you at the request of Monster User xapeix03

Charles Ratcliff 

Last updated:  12/30/13

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Jackson, MI  49202
US

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Charles Ratcliff

Resume Value: 5h68aa3duiyc765a   

  

 


 

 

 


PROFESSIONAL EXPERIENCE

 

 

WFI:

Construction Manager AT&T (9-2013- 12-2013)

Over see the construction for the Civil and Tower of LTE project.

Red Line documents, Oversee the day to day build of the sites.

 

Amerit:

Construction Manager T-Mobile. (4-2013- 9-2013)

Oversee the General Contractor on the construction of the civil and tower of sites, doing the paper work from start to finish of each site. Daily conference calls.   Site walk with the GC, working hand in hand with GC to see that the sites are built on time and quality from the start.

 

Mycom Roswell Ga. (5/2012-4-2013)             

Field manager over see the build of the head end for DAS, Civil crew’s construction the Sprint Samsung site.  Over see the civil crew’s construction of the T-Mobile Nokia Equipment sites.

 

ERICSSON, Plano TX                           

Engineer Technician I / HS1 (2011-2012)

Associate Engineer (2011)

Responsible for Installing, Testing and Integrating Ericsson equipment for Metro PCS on projects in Southeastern Michigan. Coordinated day to day alarm resolution assignments of 4 technicians. Promoted to Engineer Technician I after 4 months with the company.

 

 

Supported Verizon’s expansion of service across the US. Directly employed by several contract firms between 2007 - 2011

 

ZERO CHAOS 2010-2011

Builder 3/ Associate Engineer

Team leader for the installation of primarily Nortel equipment for Verizon to over 300 new cell towers throughout Ohio. Installed new BTS frames; ran and terminated power; installed GPS; ran T-1 cables to MIS frame; wire wrapped to T-1 pins; ran alarm cable to 66 blocks and punched it down; installed PDFB and battery backup.

 

GLOW NETWORKS Plano Tx. 2009-2010             

Builder 3/ Associate Engineer

Team leader for the installation of Verizon equipment to over 100 new cell towers throughout Ohio. Installed new BTS frames; ran and terminated power; installed GPS; ran T-1 cables to MIS frame; wire wrapped to T-1 pins; ran alarm cable to 66 blocks and punched it down; installed PDFB and battery backup.

 

ZERO CHAOS 2007- 2009             

Builder 3

Installed of Verizon equipment for new cell towers throughout Ohio. Installed new BTS frames; ran and terminated power; installed GPS; ran T-1 cables to MIS frame; wire wrapped to T-1 pins; ran alarm cable to 66 blocks and punched it down; installed PDFB and battery backup.

 

 

 

COMFORCE 2004-2006                                                                                                                                   Builder 3

Install the new Nortel Succession IP, GNS, and ATM Switch. Put up Ox bar, installed cable rack, marked floor to drill holes for frame, anchor frames, ran power termite power, ran cat-5 cables to equipment, ran 25 pr. cables to main frame blocks. Ran Fiber from fiber equipment to fiber Frame. Laced all cables to rack.

 

AJILON 2003-2004                                                                                                                                           Lead Installer                                                                                                                                                          Worked Time and Expense for Verizon.  Able to do MOP, EOJ, Gen Check list, Fiber check list, Check Bar coding, High Risk, Acceptance report, Flash Report, Engfac report, Alarm snap shot, Install equipment with little to no supervision. Installed Cenna Fiber frames. Ran fiber from Cenna equipment to Fiber patch panels. Optera 3500 Fiber frame, Ran fiber to Patch panels.

 

INSTALLER COMFORCE 2002-2003                                                                                                             Builder 3                                                                                                                                                                 DMS 100, DMS 250, DMS 500 Northern Telecom wireless equipment.

 

TAD TELECOM 2000-2002                                                                                                                                                          Lead Installer:                                                                                                                                                            Oversaw installers and made sure the equipment was Installed properly. Also assisted in the installation of equipment. Bar coding and labeling per Verizon spec.

 

US COMM 1999-2000                                                                                                                          Builder                                                                                                                                                        Installed Nortel Telecommunications DMS 500. Installed cable racks Newton MDF, frames, DSX 1 and SX 3 panels, fuse panels and power.

 

 

CERTIFICATIONS

 

Certified in Building of all Nortel/Ericsson equipment and Programming of BTS, DBU, CDMA equipment, UMTS/WCDMA 3206, RBS 6601, RBS 6201, LTE Equipment, Smart Laptop.


TECHNICAL ADDENDUM

 

Alcatel


·          DEX CS1L

·          3003

·          1631

·          1633

·          1648

·          Litespan 2000

·          2016 cabinet

·          Install Cards

·          Power

·          Cabling

·          ADSL

·          Massa 2 cabinet

·          7800 ASAM

·          HD and RT testing thru turn up


 

Fujitusu


·          ADSL equipment

·          Secore splitter shelf alarms

·          Power, cabling

·          Testing and turn up


Northern Telecommunications


·          DMS 500

·          100

·          IP

·          GNS

·          ATM

·          Succession Switch

·          Setting Bays

·          Cable Rack

·          Power Cabling

·          Fiber

·          Fiber Troughs

·          Wireless MTCM

·          MCAM

·          LIM

·          DDPC

·          GD 4 frames

·          SPME frames

·          Replace shelves for DDPC

·          BTS frame

·          MFRM-3 Radio

·          QPM's

·          TDPM

·          DPM

·          DBU Cabling

·          RBS

·          WCDMA

·          6601

·          6602

·          BSC.


 

Cisco router, spectator modem shelf and stand alone Fast Pro modems, Go Digital testing, Cenna Equipment, Fiber frames.

 

Ericsson Equipment


DBU UMTS/CDMA 3206 LTE 6002 RBS


 

Power Equipment Installed


·          Northern PCD 

·          Loraine PDUF

·          PDCF

·          Turn battery system Vortex 1000 bay and battery

·          Marricconi power frames

·          BBU's

·          Up and Alarm

·          GNB


 

Ran power wire 10agw through 750agw and terminated at both ends of power equipment.

 

Programming


·          BTS

·          DBU

·          CDMA equipment

·          RBS 6601

·          RBS 6102

·          LTE Equipment


 

Verizon


·          Carrier Adds

·          Removed MFRM2 radio's and old shelf's installed new shelf's and added MFRM3 radio's add the power and terminated power,

·          Added TDPM or QPM or combiners

·          Re-cabled radios

·          Installed the CM2,Dom, Core card

·          Ran lip file on CM2 card and added the IP address or T-1 or a split T-1 on CM2 card

·          Ran the script file on the Dom card

·          Tested the equipment after install

·          Call Test and Speed test of the Dom card that was added.


 


AT&T


 


·          Ran power

·          Install RBS 6601

·          Integrate
Fiber

·          Ran script files


Charles Ratcliff 517-937-8888              – Page 4

 

·          REFERENCES:

·          Keith Seamans 419-564-4620

·          Jason Tharp 734-5645643

·          Bryan Roller  248-622-0548

·          George Matney 313-806-6273

 

 

 

 

 

.

 

 

 

Charles Ratcliff 517-937-8888              – Page 3

 

Charles Ratcliff

1226 Longfellow              (517) 937-8888

Jackson, Mi. 49202              ratcliff.charles@gmail.com

 

COMMUNICATION TECHNICIAN

Wireless, Fiber Optics, Cable

Integrate, Test, Turn-up, Install

 

Certified Communication Technician with diverse experience installing equipment for a variety of manufacturers including: Ericsson, NORTEL, Fujitsu, AT&T, Lucent, Siemens. With Experience in Managing of job installs. Quality Audits of sites. Field Manager, Construction Manager

 

Proven ability to:

·          Develop Method of Procedures (MOP);

·          Lead installation teams;

·          Run power cable, Cat-5, 25pr. Fiber;

·          Install BTS, Power Frame, and Battery back up.

 

       



Experience

BACK TO TOP

 

Job Title

Company

Experience

Construction Management

WFI (Wireless Facilities Inc)

- Present

 

Additional Info

BACK TO TOP

 

Desired Salary/Wage:

60,000.00 - 80,000.00 USD yr

Current Career Level:

Manager (Manager/Supervisor of Staff)

Date of Availability:

Immediately

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

Inactive Clearance

US Military Service:

Yes

Citizenship:

US citizen

 

 

Target Job:

Target Job Title:

Construction Manager

Desired Job Type:

Employee

Desired Status:

Full-Time

 

Target Company:

Company Size:

Industry:

Telecommunications Services

Occupation:

Other

·         Other

Installation/Maintenance/Repair

·         Wire and Cable Install/Maintain/Repair

 

Target Locations:

Selected Locations:

US-MI-Lansing

Relocate:

No

Willingness to travel:

Up to 50% travel

 

Languages:

Languages

Proficiency Level

English

Fluent